How to Repair Peeling Behr Concrete Stain

eHow may earn compensation through affiliate links in this story. Learn more about our affiliate and product review process here.

Things You'll Need

  • Stiff wire brush

  • Coarse sandpaper

  • Shop vacuum (optional)

  • Broom

  • Noncorrosive gloves

  • Safety goggles

  • Work boots or galoshes

  • Rag Mop

  • Behr Concrete and Masonry Paint Stripper No. 992

  • Water

  • Liquid detergent

  • Behr Concrete Cleaner and Degreaser No. 990

  • Stiff scrub brush

  • Behr Concrete and Masonry Cleaner/Etcher No. 991

  • Paint roller

  • Behr Concrete and Masonry Bonding Primer No. 880

  • Behr Concrete Stain (solid recommended)

  • Large, empty paint bucket with lid

  • Paint stirring stick

  • Paint roller or paint pad

  • Nylon/polyester paint brush

  • Paint roller tray

  • Plastic wrap

  • Heavy corrugated cardboard

Image Credit: Hemera Technologies/AbleStock.com/Getty Images

Peeling Behr concrete stain can be repaired fairly easily. Peeling problems are usually due to faulty surface preparation. Once the peeling and loose areas are removed, and the surface is prepared properly, new concrete stain can be reapplied to achieve beautiful, long-lasting results. Interestingly, semi-transparent stains are more likely to peel than the solids. Keep that in mind when choosing the stain to reapply. All stain will wear over time. Choosing a shade close to the concrete it will cover will extend periods between touch-ups.

Advertisement

Preparation

Step 1

Remove loose or peeling stain with a wire brush and coarse sandpaper. Sweep or vacuum up the debris and discard.

Video of the Day

Step 2

Put on safety gear—gloves, goggles and work boots or galoshes—to prevent acid or chemical burns.

Advertisement

Step 3

Use a rag mop or broom to spread on an even layer of Behr Concrete and Masonry Stripper No. 992. Leave on for several hours according to directions on the can. Scrub with broom and water. Rinse completely. Let dry.

Step 4

Clean the mop and broom thoroughly with liquid detergent and water. Wring or shake out excess water.

Advertisement

Step 5

Scrub the area thoroughly with Behr Concrete Cleaner and Degreaser No. 990 using a clean broom or scrub brush. Rinse completely. Let dry completely. Clean broom and scrub brush as instructed in Step 2.

Step 6

Spread an even layer of Behr Concrete and Masonry Cleaner/Etcher No. 991 on the area with an old broom or rag mop. (Don't use anything metal, or the acid in the etcher will destroy it.) Rinse the area and let dry according to instructions on the can. Clean the broom and rag mop as instructed in Step 2.

Advertisement

Step 7

Use a roller or clean rag mop to spread an even layer of Behr Concrete & Masonry Bonding Primer No. 880 to all bare areas, thereby increasing adhesion of the stain to the concrete. Allow to dry according to instructions on the can. Clean roller cover and rag mop as instructed in Step 2.

Advertisement

Application

Step 1

If the project requires multiple cans of stain, combine the contents of all cans to ensure uniform color. Pour them all into a large, empty paint bucket and mix thoroughly with a paint stirring stick. Important: Do not thin.

Advertisement

Step 2

Apply an even, thin coat of stain with a clean, dry roller or paint pad. Touch up small areas with a clean brush. Let dry 24 hours. (Wrap roller or paint pad in plastic wrap, sealing out air between coats.)

Advertisement

Step 3

Apply a second thin coat of stain in a crisscross pattern to even coverage out and increase richness and durability. Clean roller cover and paint pad with liquid detergent and water; squeeze out excess water; let dry.

Advertisement

Care

Step 1

Cordon off the area to dry undisturbed following these guidelines: Wait 24 hours before allowing light foot traffic. Wait 72 hours for automotive traffic or repositioning of planters or furniture. Park with the tires resting on heavy corrugated cardboard for the first two weeks after the 72-hour mark is reached.

Advertisement

Step 2

Wipe up or hose off any spills and muddy footprints or leaves as soon as possible when they occur.

Step 3

After two weeks, dry surface discolorations can be cleaned with a nonabrasive liquid detergent. Do not use stiff or wire brushes.

Step 4

Keep up with touch-ups as wear occurs to avoid a major overhaul down the road.

Tip

Repair damaged areas such as cracks, holes, etc., using Dap Ready-Mix Driveway Concrete Patch before beginning the project.

Warning

Improper surface preparation on driveways and garage floors will cause automobile tires to lift the stain in some cases. Do not attempt this project if rainy, snowy, stormy or windy conditions are in effect or predicted for the next several days. Extend drying time in humid conditions. Periodic touch-ups may be needed depending on wear. Posted at Behr.com: If you scrape, sand or remove old paint, you may release lead dust. Stained surfaces may be slippery when wet. Use Behr Non-Skid No. 970 to minimize slipping.

Advertisement

Video of the Day

references & resources